Calculate Configuration and Term First

Two Cloud Mac Plans for Every Workload

DeployMac M4 and DeployMac M4 Pro are Apple Silicon Cloud Macs, with one dedicated physical machine per order. Resources are never shared with other users, and these are not virtual machines. Rent by the day, week, month, or quarter, then choose your configuration based on memory pressure, build concurrency, and data volume.

2 plans Available configurations
4 options Billing terms
5 Available locations
Deployment worksheet DPLYMAC / PLAN
Configurable
Resource type
Dedicated physical machine / non-virtualized
Configuration path
M4 for lightweight builds or M4 Pro for memory-intensive workloads
Rental term
Daily / weekly / monthly / quarterly
Target location
Singapore, Japan (Tokyo), South Korea (Seoul), Hong Kong, US East
Billing currency
USD
Next step Check workload and concurrency requirements
Two available configurations

Review the hardware before choosing a term

The two configurations differ mainly in chip, memory, and local storage. Start with M4 for short-term validation, single-project archiving, and low-concurrency pipelines. Consider M4 Pro first for concurrent projects, large dependency graphs, or memory-intensive experiments.

Lightweight builds and short tasks

DeployMac M4

m4-16-256

Suitable for single-project development, temporary archives, automated testing, toolchain validation, and CI tasks with controlled concurrency.

Model
Mac Mini M4
Memory
16GB RAM
Storage
256GB SSD
Daily$19.3
Weekly$52.1
Monthly$96.5
Quarterly$262.5

For tasks that run only for a few days, validate the complete workflow with a daily term first. For ongoing use, choose a longer term based on actual queue behavior and disk growth.

Four-term price comparison

Compare each term for the same configuration

All prices shown are in USD. Daily plans suit short validation runs and fixed deadlines; weekly plans suit sprint periods; monthly and quarterly plans suit persistent development environments or build runners.

DeployMac Cloud Mac pricing for two configurations and four billing terms
Configuration Daily Weekly Monthly Quarterly
DeployMac M4 $19.3 $52.1 $96.5 $262.5
DeployMac M4 Pro $61.5 $166.2 $307.7 $836.9

Base your term on continuous task runtime. Include queue time, environment rebuilds, dependency downloads, and artifact exports in your estimate. Term changes and order status are determined by the information returned in the console.

Choose by workload

Compare configurations by peak usage, not averages

Low average CPU usage does not mean 16GB of memory will always be enough. Track peak build memory, concurrent tasks, working-directory and cache size, and whether a failed task requires the full environment to be retained.

Choose a DeployMac configuration by task type, memory, storage, and concurrency
Task type Evaluation criteria Recommended configuration What to validate
Lightweight builds and short tasks Primarily one project; stable dependency size; peak memory stays within 16GB; local working set fits within the available space on a 256GB SSD. DeployMac M4 Run one complete archive, export, and artifact-validation cycle to confirm there is no memory pressure or disk-cleanup bottleneck.
Daily multi-project development Compare both tiers based on the number of open projects, simulators or test processes, cache size, and background-service usage. M4 for low concurrency; M4 Pro for high concurrency or greater headroom Record peak RAM, parallel build count, task duration, and the cost of failed-task retries.
CI/CD runner Start with M4 for serial queues and short tasks. For multiple concurrent runners, many repositories, or long-lived caches, prioritize calculating the need for 64GB RAM and 2TB SSD. Choose between M4 and M4 Pro based on concurrency Run multiple rounds with real repositories and observe cache hits, queue wait time, disk growth, and task isolation.
Large-model inference and memory-intensive experiments Total memory for the model, context, runtime, and other processes clearly exceeds a lightweight development environment, or large datasets and intermediate results must be retained. DeployMac M4 Pro Check model memory requirements and disk volume first, then validate with the target input size rather than an idle environment.
RAM

Measure against peak workload

Measure the IDE, build processes, simulators, cache services, and remote sessions together. When memory approaches its limit, occasional concurrency can significantly change completion time.

SSD

Account for cache growth

In addition to source code, calculate dependencies, archives, symbol files, test reports, and logs. Evaluate an SSD upgrade at checkout if you need more space.

JOB

Validate with real concurrency

Do not substitute a single empty-queue test for production load. Reproduce the number of tasks that run concurrently during a normal peak before upgrading the configuration.

Add-on pricing

Add-ons are priced separately; review each term

Choose add-ons based on data volume, retention period, and device coordination. Do not use expanded storage instead of cleaning build artifacts, and do not add Thunderbolt 5 without a defined linking requirement.

Storage upgrade

+1TB SSD

Suitable when dependency caches, archives, and test artifacts exceed the base drive headroom but a larger data working set is not needed.

Daily
$2.8
Weekly
$7.6
Monthly
$14.1
Quarterly
$38.4
Storage upgrade

+2TB SSD

Suitable for larger model files, multi-project archives, long-term caches, or workloads that retain intermediate results from multiple experiments.

Daily
$5.6
Weekly
$15.2
Monthly
$28.2
Quarterly
$76.8
Device linking

Thunderbolt 5 linking (per device)

For deployments with a confirmed need for high-speed coordination between devices. Before ordering, define the device count, data flow, and whether the toolchain supports the target setup.

Daily
$1.2
Weekly
$3.3
Monthly
$6.1
Quarterly
$16.6
Five-location availability matrix

Both configurations are available in every listed location

Singapore, Japan (Tokyo), South Korea (Seoul), Hong Kong, and US East offer both catalog configurations. “Available” means the model-location combination is normally orderable in the catalog; actual availability and delivery details are returned in real time by the console.

DeployMac configuration availability across five locations
Configuration Singapore Japan (Tokyo) South Korea (Seoul) Hong Kong US East
DeployMac M4 Available Available Available Available Available
DeployMac M4 Pro Available Available Available Available Available
01

Test from your primary access location

Test candidate locations from the fixed network your team uses every day. Do not substitute a single mobile-network result for the long-term network path.

02

Include repository and dependency locations

The path to code repositories, artifact services, and dependency sources also affects the complete pipeline—not just remote desktop responsiveness.

03

Finish with a real build

Run a real repository build in the candidate location and record the time for fetching, dependency restoration, compilation, testing, and artifact upload.

Pre-order checklist

Complete seven checks before submitting your configuration

Writing down the workload, concurrency, storage, and location first can reduce the need to recheck your configuration after ordering.

  • Define the workload:Specify whether this replaces local development, supports short-term builds, runs continuous CI/CD, or powers memory-intensive experiments.
  • Choose the location:Consider your primary access location, team time zone, repository location, and dependency-service paths together.
  • Check chip and memory:The base tier is M4 / 16GB; the higher tier is M4 Pro / 64GB.
  • Confirm the billing term:Daily, weekly, monthly, and quarterly terms suit different runtimes; include environment setup and result exports.
  • Evaluate SSD add-ons:Calculate the combined space required for source code, dependency caches, archives, logs, models, and intermediate results.
  • Prepare remote access:Confirm that your local network, command-line tools, and graphical remote-access client meet your needs.
  • Confirm USD billing:Check supported payment methods and order details in advance.
Payments and orders

Two payment methods supported

USDT-TRC20 Orders are priced and settled in USD
Visa / Mastercard / Amex Processed by Stripe; the actually available gateway is shown in the console

After ordering, view the device configuration, location, term, and order status in the console. Recheck the model, term, location, and add-ons before submitting.

Final pre-submission check

The order confirmation is the delivery reference

This page compares catalog configurations and public prices. The final device details, location, add-ons, and term are determined by the order confirmation generated in the console.

Read the first-connection acceptance steps
Plan considerations

Confirm these points before ordering

Choosing a configuration involves more than comparing chips and prices. Term changes, network paths, additional storage, device linking, and delivery details all affect the final workflow.

How can I choose or change the rental term?

At checkout, choose from daily, weekly, monthly, or quarterly terms. Your estimate should include environment reproduction, dependency downloads, build execution, result validation, artifact export, and cleanup. For existing orders, the current order status in the console determines available term information and actions.

Should the location be based on the team or the repository?

Test both. Start by comparing connectivity from your primary access location to Singapore, Japan (Tokyo), South Korea (Seoul), Hong Kong, and US East. Then include code repositories, dependency sources, artifact services, and the team’s working time zone. Finish with one complete build from a real repository.

When should I add a +1TB SSD or +2TB SSD?

Evaluate an upgrade when source code, dependencies, archives, test reports, symbol files, models, and intermediate results exceed the base drive’s practical capacity. First establish cleanup rules and retention periods. If growth comes from disposable caches, optimize cleanup instead of immediately expanding the disk.

When is Thunderbolt 5 linking suitable?

It suits deployments that clearly require coordination across multiple devices and whose toolchain supports the intended data flow. This add-on is priced per device. Confirm the device count, linking purpose, data path, and task-scheduling method before ordering; linking is not a general performance upgrade.

How do I confirm the final delivered configuration and location?

After submitting your order, verify the device configuration, location, term, system information, and access credentials in the console. Catalog combinations are normally orderable, while actual availability and final delivery details are determined by the console’s live response and the order confirmation. After first connection, validate the chip, memory, disk, and system version against the support documentation.

Configure your order

Start ordering with a defined configuration, term, and location

If you have not finished selecting a plan, record peak memory, concurrent task count, working-set size, and primary access location first. If the parameters are clear, proceed directly to configuration.